EXPERIENCE
We have acquired wide experience of developed projects, highlighting the ethical commitment to our customers and compliance with legal responsibilities and applicable regulations.
MAJA Consulting Group has the committed to providing our customers the best alternative for your needs and requirements.
MAJA Consulting Group participates in the publication of the first book of Functional Safety published by ISA in Spanish.
- ISBN: 9788499692104
- Páginas : 526
- Editorial : Díaz de Santos
- Año Publicación : 2012
- Nº Edición : 1
- Clasificación: Ingeniería Industrial
- País de Publicación : ESPAÑA
- Papel.: 9788490522615
- ISBN Ebook: 9788490522905
- Páginas : 518
- Editorial : Díaz de Santos
- Año Publicación: 2020
- Nº Edición : 2
- Clasificación: Ingeniería Industrial
- País de Publicación : ESPAÑA
Our Projects
- Engineering, procurement and construction of the modernization and
- Reconfiguration of the Station of Operation and Control System, updating of the natural gas measurement systems, supply and installation of a natural gas pressure regulation system, updating of the electrical and power system, integration of two Gas Turbocompressor packages including its test and commisioning in the Cempoala Compression Station.
- Functional Engineering for the Emergency Shutdown System in the Xan Process Plant, Perenco Guatemala Limited, including laser scanining surveying, LOPA, and Conceptual SIS Design for the plant.
- HazOp, QRA (Consequence Analysis), LOPA/ SIL Determination, and SIF List for the Dioxitek Uranium Dioxide Formosa Plant (Disolution and Purification Process), activities developed in the existing Uranium Dioxide Plant in Argentina.
- HAZID (Preliminary Hazard Analysis) of the Combined Cycle Central Pesquería, Nuevo León, for the Balance of Plant and Power Isle, Gas Pipeline and Water pipeline inlets.
- Supply, installation and testing anf commisioning of the fire and blast resistant Control Room, Hydrocarbon Fractioner Plant, Coatzacoalcos Area Gas Processing Complex, Cangrejera Sector, including :
- Smoke detection and fire suppression sytem (clean agent).
- Fire and Gas Detection System (outdoors).
- Air Conditioning And Pressurization (HVAC)
- Electrical Power Supply
- Lighting Protection
- Physical and Electronic Ground System
- Civil works
- Process Control System Signal Migration to the new Control Room.
MORE THAN 3,000,000
MAN HOURS IN ENGINEERING.
MORE THAN 2,000,000
MAN HOURS UNDER CONSTRUCTION
143
PROJECTS SUCCESSFULLY COMPLETED
15
YEARS OF EXPERIENCE
MORE THAN 400
ARP AND FUNCTIONAL SAFETY STUDIES
MORE THAN 350,000
MAN HOURS IN FUNCTIONAL SAFETY PROJECTS AND ARP STUDIES